Wednesday, October 22nd12.6°C
23711
22501

Enbridge:U.S. taking longer than expected to weigh Alberta clipper expansion

CALGARY - Enbridge Inc. (TSX:ENB) says the U.S. State Department is taking longer than expected to review an expansion to an Alberta-to-Wisconsin pipeline.

But executives with the Calgary-based energy shipper said Friday they're confident of getting a green light in time to expand the Alberta Clipper line to 800,000 barrels per day by the middle of next year.

Enbridge obtained a U.S. federal permit in 2009 before starting up the first 450,000-barrel-per-day phase of the line, but the State Department says it needs to amend its environmental review before allowing the expansions to go ahead.

The company had initially expected a mid-2014 decision, but as public scrutiny over oil pipelines intensifies, the process is being drawn out.

"Obviously, things take longer in this environment that we're in," CEO Al Monaco told reporters and analysts on a conference call to discuss the company's fourth-quarter results, which included a net loss.

"I don't think we want to draw any conclusions about the political environment. It's not something that we can control. What we control is the fullness of our application," Monaco said.

"I think there's a lot more questioning or intervention by various groups. I think the regulatory authorities are doing their best to work through what they need to and that's the process that we need to follow."

Enbridge envisaged expanding Alberta Clipper in two phases. The first expansion was to bring the line to 570,000 barrels a day by the middle of this year. A second would bring it to the full 800,000 barrels by mid-2015. The plan does not entail laying down any new pipe; rather, capacity is to be boosted by adding pumping horsepower.

"In this case, this is a fairly routine matter. The pipeline's already in the ground, so we're hoping that we move this along as quickly as possible," said Monaco.

In the meantime, Enbridge says it has the means to lessen the impact of the delay on the first expansion phase, which is not expected to affect its earnings for this year. One of the measures it's taking is adding a "drag reducing agent" to its pipelines to help flow more oil through them.

Pipelines that cross the Canada-U.S. border require the blessing of the State Department.

Another Canadian pipeline firm, TransCanada Corp. (TSX:TRP), has been seeking U.S. approval to build its Keystone XL pipeline since 2008, but the debate over that pipeline has become highly politicized and the company has faced a number of setbacks.

The State Department released its final environmental report into Keystone XL two weeks ago and concluded that future oilsands output — and its accompanying contribution to higher greenhouse gas emissions — does not hinge on a single pipeline. U.S. President Barack Obama has the final say and it's not clear when that decision will be announced.

Jim Murphy, senior counsel at the National Wildlife Federation, said the Alberta Clipper delay shows that planned expansions in Alberta's oilsands are "far from a sure thing."

"Enbridge has acknowledged that the permitting of its massive expansion plans to pump tarsands through the Great Lakes via the Alberta Clipper pipeline isn't turning out to be the rubber stamp it hoped for."

Also Friday, Enbridge announced some executive changes. Steve Wuori, currently in charge of oil pipelines, will become a strategic adviser to Monaco. Guy Jarvis, currently chief commercial officer for liquids pipelines, will replace Wuori.

Earlier in the day, Enbridge posted a $267-million net loss in the fourth quarter as it took a hedging loss in its energy services division. A year earlier, Enbridge posted a $146 million profit worth 18 cents per share.

Stripped of one-time items, Enbridge's adjusted earnings were $362 million, or 44 cents per share in the quarter, up from 42 cents per share in the comparable period of 2012 but short of analyst estimates of 46 cents per share.

"Although profitability declined in most of Energy Services' lines of business, the fourth-quarter loss primarily related to losses realized on financial contracts intended to hedge the value of committed physical transportation capacity, but which were not effective in doing so in the last three months of the year," the company said.

In addition to the financial report, Enbridge announced its quarterly dividend will rise by 11 per cent.

The payout to Enbridge shareholders will rise to 35 cents per common share as of March 1.

Follow @LaurenKrugel on Twitter

The Canadian Press


Read more Business News

22831


Recent Trending




Today's Market
S&P TSX14312.07-235.64
S&P CDNX808.00-14.28
DJIA16461.32-153.49
Nasdaq4382.847-36.632
S&P 5001927.11-14.17
CDN Dollar0.8899-0.0009
Gold1241.30-10.3999
Oil80.01-1.95
Lumber329.90+0.30
Natural Gas3.655-0.056

 
Okanagan Companies
Pacific Safety0.12+0.02
Knighthawk0.01-0.005
QHR Technologies Inc1.15-0.02
Cantex0.055-0.025
Anavex Life Sciences0.198+0.006
Metalex Ventures0.05+0.005
Russel Metals32.53-0.56
Copper Mountain Mining2.10-0.07
Colorado Resources0.145-0.005
ReliaBrand Inc0.013+0.001
Sunrise Resources Ltd0.05-0.01
Mission Ready Services0.405-0.055

 



23434

FEATURED Property
2089647750 Francis
5 bedrooms 4 baths
$398,000
more details
image2image2image2
Click here to feature your property
Please wait... loading


Keep it rubber side down

This time of year, I always worry about which friends of mine will get caught going off the road in adverse weather conditions. With a little preparation most accidents can be avoided. Having won the...


Big bank predicts rate hike

Photo: Thinkstock.comThe end of record-low rates is nigh, according to one major bank, which has taken a stance and predicted when the Bank of Canada will raise its long-standing overnight rate. &ldq...


Experts share strategies in Kelowna

The third week in October is “Small Business Week”, a week dedicated to supporting local, small businesses. The week was designed to bring awareness to Canadians about the role small busin...

_








Member of BC Press Council


22771